Vighnesh Consultancy

Empowerment of Productivity

We will be very flexible and having the system according to your concern and not a rigid one as we think “Globally and act locally”.

Read More
PRODUCTION PLANNING

Capacity Analysis, Delivery date wise Line planning

LEAD TIME

Lead time is directly proportional to Profit


ACCOUNTABILITY

Accountability plays a major role in all the process covering from Raw material input to despatch

App

Vighnesh Consultancy

We the Vighnesh Consultancy engaged in Textile management consultancy (Tirupur based) for the past 18 years, covering the complete process sequence in to our fold.

We just highlighted the way of our approach and the direction we travel will cover all the segments. We the team will be success only with your cooperation to move in a systematic way. We will be very flexible and having the system according to your concern and not a rigid one as we think “Globally and act locally”. All the implementations are purely based on our past experience and the WIN situation.

App

Need of the hour in our trade is

  • Production Planning
  • Lead Time
  • Accountability
  • Traceability

Production Planning

  • Capacity Analysis
  • Delivery date wise Line planning
  • As per line plan we find any delivery issue
  • Continuous monitoring line plan if deviation we alter line plan as per delivery schedule
  • Time Management
App
App

Lead time

  • Lead time is directly proportional to Profit.
  • Lead time determines the turnover of the company.
  • In turn the turn over reflects the overhead.
  • Overhead leads to Growth of the company in sustainable way.
  • Growth will happen only when monitoring happens in all process on daily basis.
  • Monitoring with real time data will help us to find out the root cause of the issues.
  • Once the root cause for the issues are clear then corrective actions and continual monitoring of the rectification part need to follow
  • Our Lead time for orders is 45 to 60 days according to style & Yarn
  • Maximum we take 90 days for order to ship. Data analysis below

Accountability

  • Accountability plays a major role in all the process covering from Raw material input to despatch
  • The accountability in each process need to have two ends...opening and closing.
  • It is our responsibility to communicate with all the concerns to have a clear accountability which needs to be closed by authorised persons.
  • The result of the accountability lies in finding out the difference between the Pre budget and Post budget
App
App

Traceability

  • Traceability in our textile field is nothing but Time and Action (T&A) plan.
  • T&A planning is not the responsibility on one department to freeze it, this is a collective decision taken by all the department HOD’s.
  • T&A need to depend upon the bench mark of our concern in that particular process and need to be achievable.
  • The deviations in T&A need to be addressed on daily basis and Top management plays a vital role in this segment.

NECESSARIES OF T&A

  • Analysis of T&A – Plan Vs Actual
  • Daily T&A Deviation
  • Lead Time for Each process to be fix
  • Order sheet received to Fabric In-house
  • For special yarn
  • Sample & Approval
  • Cutting to Packing
  • Cycle time for an order to be minimize
  • Less Cycle time = More TURNOVER
App
App

Why we are delay in deliveries

  • Analysis capacity plan of factory
  • Line Plan
  • Age (Lead Time) of every process
  • Non Sustainability of labours & Multi skilled labour
  • Decision Making
  • Shortage





REPORTS

  • Orders in Hand – Total Order list
  • Fabric Roll to Roll packing list
  • Lead Yarn to Fabric closure Report
  • Fabric outstanding Report- In every process with Age
  • Cutting Chart

  • Production report
  • Rejection & Rework Report
  • Fabric shortage Report
  • Accessories Shortage Report
  • Missing Pieces Report

  • Order closure Report
  • Inspection Report
  • Monthly Despatch Report
  • Excess & Shortage Pieces Report
  • T&A Deviation
  • P&L